Summary
The former industrial building at 300 Oak Street is being converted into a creative space for trade, manufacturing, design and technology career training. The design-build contract is the first phase step.
At a glance
- Total mentions
- 1
- Last 30 days
- 1
Discussed at 1 meeting in the last 60 days; most recently Oct 29, 2026.
Impact analysis
Phase 1 design and pre-construction services cost $228,122, funded in the FY 2026-2027 budget.
Residents seeking training in trades, manufacturing and technology careers.